Sharp 21F-A30 Návod k obsluze Strana 29

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 192
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 28
OPERATION
Form 169000 / 169040 27 Revision C
6.3.3 Drawbar Hitch Set-Up
a. Secure the tractor drawbar so the hitch-pin hole
is directly below the driveline.
b. Loosen bolts (B) on extension assembly (A), and
slide onto drawbar.
c. Install pin (C) through drawbar and extension
from underside, and secure with hairpin.
d. Gradually tighten the four bolts to 265 ft·lbf
(359 N·m).
e. Attach the swivel APT member (D) with pin (E)
onto the APT.
f. Secure pin with clevis pin (F), washers, and
cotter pin.
g. Assemble PTO driveline male half (G) onto PTO
shaft (H) on APT. Push male half so that PTO
shaft is at its “fully compressed” length.
h. Locate PTO shaft in hook (J).
E
D
A
C
B
F
H
G
J
Zobrazit stránku 28
1 2 ... 24 25 26 27 28 29 30 31 32 33 34 ... 191 192

Komentáře k této Příručce

Žádné komentáře